The third phase of the Teruel Penitentiary Center involved the expansion of strategic infrastructure aimed at strengthening the complex’s operational and functional capacity. Spanning an approximate area of 11,000 m², the project required the development of electrical installations adapted to the demanding standards of safety, power redundancy, and reliability typical of critical public infrastructure.
With an installed capacity of 2 MW, the designed electrical system ensures a continuous supply to the various buildings, security systems, perimeter lighting, technical facilities, and operational equipment of the site. The execution of the electrical infrastructure was integrated into the construction process led by Acciona, ensuring efficient energy distribution, internal grid stability, and response capacity for high electrical demand scenarios in an environment where service continuity is critical.